FAQs

Frequently Asked Questions


Pipers recommends you dispose it at your local tip or through council arrangements.
Available by Pipers on request. On completion of the installation, you may require a Compliance Certificate which outlines compliance with Australian Standards (AS2208 and AS1288 or others). Please email info@pipersinternational.com.au with your details or invoice number & we will arrange the correct certificate.
If you choose to install your own shower screen, we strongly recommend the Elfreda Suite 300. There is adequate adjustment and is designed to fit snug into most shower areas. We have over 40 sizes available with manufacturing capabilities for hobs/custom return panels.
We use a high grade structural neutral cure silicone.
  1. Engineered Oak 5G
  2. Laminate
  3. SPC
After your plumber has completed the plumbing, and your walls and base are tiled/completed. Your shower is the last thing to go in.
Simply multiply the length of the area by the height. For example if the height is 750mm and the length is 2200mm: 0.75m x 2.2m = 1.65m2